{"product_id":"eaton-pdumh20ats-1-92kw-120v-single-phase-ats-local-metered-pdu-16-5-15-20r-outlets-dual-l5-20p-5-20p-inputs-12-ft-cords-1u-taa","title":"Eaton PDUMH20ATS – 1.92kW ATS\/Metered PDU, 1U","description":"\u003ch2\u003eProduct Overview\u003c\/h2\u003e\u003cp\u003eThe Eaton PDUMH20ATS is a 1.92kW 120V single-phase ATS\/local metered PDU combining automatic transfer switching with built-in current metering for network IT racks. This 1U rack-mount PDU features 16 NEMA 5-15\/20R outlets, dual L5-20P\/5-20P inputs, and 12-foot cords, giving small computer rooms and equipment racks both dual-source resiliency and real-time local load visibility in a single unit. TAA compliance makes it eligible for federal and GSA Schedule procurement.\u003c\/p\u003e\u003ch2\u003eProduct Description\u003c\/h2\u003e\u003cp\u003eRacks that need to stay powered through a source failure, while also keeping an eye on total load, benefit from combining automatic transfer switching with local metering in one device — which is exactly what the PDUMH20ATS provides. Its built-in digital current metering reports the total load level for all connected equipment in real time, helping technicians confirm loads remain well below maximum capacity as equipment is added, which supports lower total cost of ownership by avoiding both nuisance overloads and premature capacity upgrades. The PDU features 16 NEMA 5-15\/20R 120V outlets for connecting IT equipment, and its automatic transfer switching (ATS) capability switches to a secondary power source within 2-7 milliseconds if the primary source fails or becomes unstable, so connected equipment continues operating without interruption. An on-board ATS processor constantly evaluates power quality on both inputs and will not switch to the secondary source if it is unavailable or of lower quality than the primary. Dual 12-foot (3.7-meter) power cords with NEMA L5-20P inputs — two 5-20P adapters are included — connect to separate primary and secondary mains circuits, backup generators, UPS systems, or utility power grids, including out-of-phase sources. The all-metal housing mounts into 1U of rack space in an EIA-standard 19-inch rack using included mounting hardware, or the mounting brackets can secure the unit to a wall or under a counter. TAA compliance makes the PDUMH20ATS eligible for GSA Schedule and other federal procurement contracts, an important consideration for integrators serving government IT environments.\u003c\/p\u003e\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0603\/7982\/4364\/files\/pdumh20ats.jpg?v=1786674020\" alt=\"Eaton PDUMH20ATS 1U ATS\/local metered PDU with 16 outlets, dual L5-20P inputs, digital load meter\"\u003e\u003ch2\u003eKey Features\u003c\/h2\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eAutomatic Transfer Switching (ATS)\u003c\/strong\u003e — Switches to a secondary power source within 2-7 milliseconds if the primary fails or becomes unstable.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDigital Load Metering\u003c\/strong\u003e — Reports total load for all connected equipment in real time to help prevent overloads.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e16 NEMA 5-15\/20R Outlets\u003c\/strong\u003e — Provides ample outlet count for network IT and small computer room equipment.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDual L5-20P Inputs with Adapters\u003c\/strong\u003e — Connect to separate primary and secondary power sources, including out-of-phase circuits.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e1U Rack-Mount or Wall Installation\u003c\/strong\u003e — Fits in 1U of rack space or mounts to a wall or under a counter.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTAA Compliant\u003c\/strong\u003e — Eligible for GSA Schedule and other federal procurement contracts.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch2\u003eTypical Applications\u003c\/h2\u003e\u003cul\u003e\n\u003cli\u003eNetwork IT racks requiring dual-source failover with load visibility\u003c\/li\u003e\n\u003cli\u003eSmall computer rooms needing both ATS resiliency and metering\u003c\/li\u003e\n\u003cli\u003eGovernment and federal data center deployments requiring TAA compliance\u003c\/li\u003e\n\u003cli\u003eEquipment racks connected to both utility power and a backup UPS or generator\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch2\u003eTechnical Specifications\u003c\/h2\u003e\u003ctable\u003e\n\u003ctr\u003e\n\u003ctd\u003ePower Capacity\u003c\/td\u003e\n\u003ctd\u003e1.92kW\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eVoltage\u003c\/td\u003e\n\u003ctd\u003e120V\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePhase\u003c\/td\u003e\n\u003ctd\u003eSingle-phase\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOutlets\u003c\/td\u003e\n\u003ctd\u003e16x NEMA 5-15\/20R\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eInput Plugs\u003c\/td\u003e\n\u003ctd\u003eDual NEMA L5-20P (5-20P adapters included)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCord Length\u003c\/td\u003e\n\u003ctd\u003e12 ft. (3.7 m), dual cords\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eForm Factor\u003c\/td\u003e\n\u003ctd\u003e1U Rack-Mount\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eCompliance\u003c\/td\u003e\n\u003ctd\u003eTAA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/table\u003e\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\u003ch3\u003eDoes this PDU provide both metering and transfer switching?\u003c\/h3\u003e\u003cp\u003eYes, the PDUMH20ATS combines automatic transfer switching (ATS) between two power sources with local digital metering of total connected load.\u003c\/p\u003e\u003ch3\u003eHow fast does the transfer switch operate?\u003c\/h3\u003e\u003cp\u003eThe ATS function switches to the secondary source within 2-7 milliseconds if the primary source fails or becomes unstable.\u003c\/p\u003e\u003ch3\u003eHow much rack space does this PDU require?\u003c\/h3\u003e\u003cp\u003eIt mounts in 1U of space in an EIA-standard 19-inch rack, or can be wall- or under-counter mounted using the included brackets.\u003c\/p\u003e\u003ch3\u003eIs this PDU eligible for federal procurement?\u003c\/h3\u003e\u003cp\u003eYes, it is TAA compliant, making it eligible for GSA Schedule and other federal procurement contracts.\u003c\/p\u003e\u003ch3\u003eWhat input connections does this PDU require?\u003c\/h3\u003e\u003cp\u003eIt requires two separate 12-foot power cords with NEMA L5-20P plugs, each connecting to a distinct power source; 5-20P adapters are included.\u003c\/p\u003e\u003ch3\u003eWhat does the digital load meter display?\u003c\/h3\u003e\u003cp\u003eIt displays the total connected load in amps, helping technicians monitor usage and avoid overloading the circuit.\u003c\/p\u003e\u003ch3\u003eWhat warranty applies to this PDU?\u003c\/h3\u003e\u003cp\u003eEaton backs this unit with its standard manufacturer warranty; contact Creation Networks for the current term and any extended coverage options.\u003c\/p\u003e","brand":"Eaton","offers":[{"title":"Default Title","offer_id":48159675220204,"sku":"PDUMH20ATS","price":606.1,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0603\/7982\/4364\/files\/pdumh20ats.jpg?v=1786674020","url":"https:\/\/creationnetworks.net\/products\/eaton-pdumh20ats-1-92kw-120v-single-phase-ats-local-metered-pdu-16-5-15-20r-outlets-dual-l5-20p-5-20p-inputs-12-ft-cords-1u-taa","provider":"Creation Networks","version":"1.0","type":"link"}